Project · Sakers House No. 2026-001

Sakers House
Punch List

HEARTH · Spark
0 / 0
0%
0 / 13 sections TODAY · 0
Build Card: Blue Amex for materials — flooring trim, caulk, paint, outlets, plates, screws, blades, etc. Scan receipts in app.
00

Today — Settle In First

0/9
▾ Comfort first · then work as you feel up to it
First — Make the Room Yours
1
Grocery run — anything for yourself + Charlie
Personal food, dog food / treats, anything you need on hand.
2
Move Nick's unused mini fridge → your room
For beers, breakfast, whatever you want close by.
3
Set room up hotel-style for you + Charlie
Bedding, lamp, towels, Charlie's bowl + bed, anything else for comfort over the next few days.
Then — Hands-On Queue (when ready)
4
Move wet stuff off front porch — spread to dry
5
Move dry items inside / off porch
6
Move mattresses from Nick's room → office
7
Old bedframe → curb (bulk trash / free pickup)
8
Vacuum mess in Nick's room
9
Kyle's bedroom set: storage → Nick's room
01

Priority — Mom & Levi Bedroom

0/2
Apply elastomeric to roof leak (exterior)
Patch drywall in Mom's room
Let interior dry fully after roof is sealed.
02

Mom's Room Back Door

0/4
Confirm lock works and door operates correctly
Two coats exterior paint
Raw wood interior door used outside — seal all edges and bottom.
Scrape plastic off door glass
Install interior blind on door glass
03

Kitchen Remodel

0/14
Cabinets (before countertop)
Reposition, level, and screw off lower run in dining room
Uppers already installed.
Test lazy Susan fit on both blind corners
If no fit, build custom shelf BEFORE countertop goes on.
Hang cabinet doors and pulls
Caulk all gaps around cabinets
Block bug entry.
Install toe kicks
Countertop / Backsplash / Outlets
Decide outlet plan for lazy Susan corner
Currently on extension cord. Pop-up outlet (hole saw) vs. channel up through backsplash.
Install countertop
Tile backsplash and adjust outlets
Range Hood
Install range hood and tie into existing ductwork
Patch hole in ceiling / attic
Current bug entry path from attic.
Other
Install new kitchen faucet
Clean and paint grout lines in dining room / Chance's room
Clear clutter from AC return closet
Vacuum AC closet dust and change filter
04

Office Room

0/5
Install ceiling fan
Replace two outlets
Flooring transition strip
Quarter round trim
Window curtains
05

Nick's Old Room

0/3
Disassemble old bedframe, take to curb (bulk trash / free pickup)
Vacuum mess from under bed
Move Kyle's bedroom set from storage into room
06

Guest Bathroom

0/4
Swap Fluidmaster
Swap showerhead
Swap outlet
Clear slow shower drain
07

Doors Around House

0/3
French doors: Drill out left side strike opening
So right slab latches without slamming.
French doors: Foam weatherstrip to soften slamming
Front door: Assess at Builders Bargain — full jamb or slab only?
Skin bent and peeling, cutting feet, bug entry. Install can wait.
08

Exterior / Back Porch

0/6
Spray back porch ceiling with mold remover
Build new screen door for back porch
Replace damaged screen
Swap mop sink
Swap outdoor ceiling fan / light fixture
Finish exterior paint
09

Whole House

0/7
Swap 2–3 ceiling fans
Change hallway light fixture
Swap remaining light fixtures
Swap outlets and cover plates
Caulk bug entry cracks around house
Remove AC grills, clean mold from grills and duct openings
Photograph inside ducts
Determine if pro duct cleaning is needed.
10

Cable Reroute

0/1
Reroute hallway floor cable to modem behind TV
Any route, attached by anything. Just kill the trip hazard.
11

Declutter / Logistics

0/4
Pile bulk trash at road
Organize shed to make room for porch items
Clear front porch
Curb appeal from street.
Drop off spare cabinet material at Aunt Kathy's trailer (after using what's needed)
12

Kava Bar — Oakland Park

0/8
▾ Separate location · 2751 E Oakland Park Blvd
Soundproof insulation into wall cavities
Hang couple sheets of drywall
Quick finish + paint roll on drywall
Hide two demising-wall doorways to neighbor unit.
Open drain cleanout, flood test with water
Verify tie-in still works.
Load up remaining tools
Haul couch to trash
Move countertop material to back hallway, wrap in tarps
Protect from rain during floor refinishing.
Reinstall drop ceiling tiles
Sequencing Notes